0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Durability assessment of reinforced concrete structures due to chloride ingress up and beyond induction period

 Durability assessment of reinforced concrete structures due to chloride ingress up and beyond induction period
Autor(en): , , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 2488-2495
DOI: 10.2749/vancouver.2017.2488
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.31 MB

Chloride ingress in reinforced concrete structures is the main cause for the corrosion of reinforcing steel. This paper presents a new chemo-mechanical model up and beyond induction period, taking ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Czech Technical University in Prague, Faculty of Civil Engineering, Thákurova 7, 166 29 Prague 6, CZ)
(Czech Technical University in Prague, Faculty of Civil Engineering, Thákurova 7, 166 29 Prague 6, CZ)
(Červenka Consulting s.r.o., Na Hřebenkách 55, 150 00 Prague 5, CZ)

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 2488-2495 Anzahl der Seiten (im PDF): 8
Seite(n): 2488-2495
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.2488
Abstrakt:

Chloride ingress in reinforced concrete structures is the main cause for the corrosion of reinforcing steel. This paper presents a new chemo-mechanical model up and beyond induction period, taking into account concrete mix design, supplementary cementitious materials, concrete cover, effect of cracking, and environmental conditions. The 1D model of transient problem of chloride ingress is extended for crack effects, which accelerates propagation. Fracture–plastic constitutive model is used for the modelling of externally induced cracks. The influence of cracks is large, e.g. crack width 0.3 mm decreases the induction time approximately five times when compared to intact concrete. Once the end of induction period is reached, progressive corrosion stage takes place. The corrosion current densityicorr is used for calculating the time of concrete spalling for chlorides. After concrete spalling, reinforcement is subjected to corrosion without any protection. The models are validated using two practical cases; the Nougawa bridge from Japan and a strut of a concrete bridge from the Czech Republic.

Stichwörter:
Dauerhaftigkeit Lebensdauer