Difficulties on Earthquake Design due to Standards Limits on an Extensive Offshore Bridge, Sheikh Jaber Al-Ahmad Al-Sabah Causeway in Kuwait

 Difficulties on Earthquake Design due to Standards Limits on an Extensive Offshore Bridge, Sheikh Jaber Al-Ahmad Al-Sabah Causeway in Kuwait
Autor(en): , , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S23-47
DOI: 10.2749/nantes.2018.s23-47
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.3 MB

Subiyah project design was implemented with long discussions due to standards limits. With 36 km of viaducts, all decisions had a significant impact on quantities and then on cost.

Project is...
Weiterlesen

Bibliografische Angaben

Autor(en): (Systra Consulting and Engineering, Paris, France)
(Systra Consulting and Engineering, Paris, France)
(Systra Consulting and Engineering, Paris, France)
(Systra Consulting and Engineering, Paris, France)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S23-47 Anzahl der Seiten (im PDF): 9
Seite(n): S23-47
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/nantes.2018.s23-47
Abstrakt:

Subiyah project design was implemented with long discussions due to standards limits. With 36 km of viaducts, all decisions had a significant impact on quantities and then on cost.

Project is based on 2.5 and 3.0 m monopiles and standards design requirements are not adapted for such diameters. Moreover, some additional project requirements, not addressed in most of the codes, made also the design more complex (service earthquake and imposed strength reduction factor). All those parameters led to complex discussions on earthquake design: R factor value, capacity design, seismic detailing, P-D effect, asynchroneous motion, seismic design of bearings.

The aim of this article is then to present all the previous inconsistencies of project standards for non-typical structures, all related discussions, and the numerous comparisons that have been done with Eurocode to explain and/or solve the problems.

Stichwörter:
Eurocode Lager Erdbebenbemessung