0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Development of Earthquake Crisis Management Strategic Plan for Metropolitan Motorway Systems

 Development of Earthquake Crisis Management Strategic Plan for Metropolitan Motorway Systems
Autor(en): , , ,
Beitrag für 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, veröffentlicht in , S. 424-425
DOI: 10.2749/222137908796293226
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

The paper presents the development of a new methodology for prediction, rapid diagnosis and assessment, and management of the consequences of a strong seismic event affecting an urban transportatio...
Weiterlesen

Bibliografische Angaben

Autor(en):



Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Veröffentlicht in:
Seite(n): 424-425 Anzahl der Seiten (im PDF): 8
Seite(n): 424-425
Anzahl der Seiten (im PDF): 8
Jahr: 2008
DOI: 10.2749/222137908796293226
Abstrakt:

The paper presents the development of a new methodology for prediction, rapid diagnosis and assessment, and management of the consequences of a strong seismic event affecting an urban transportation network. The methodology is divided in three stages: (a) pre-seismic risk assessment of major structures along the motorway, (b) estimation of strength and vulnerability of structures, and (c) parametric analysis of the consequences of different seismic scenarios, both in terms of structural damage and with regard to traffic operations. This way, the expected damage for the various structures of the network and its consequences are estimated before the occurrence of a possible future seismic episode, allowing timely preparation of a robust strategic plan for rapid assessment and crisis management. The strategy encompasses the actions to be taken by the network administrator in order to ensure safety and achieve optimum serviceability of the motorway.

Stichwörter:
Brücken Erdbeben Risikobewertung Krisenmanagement Tunnel