0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Development and implementation of a new steel bridge edge beam for a cost-efficient replacement

 Development and implementation of a new steel bridge edge beam for a cost-efficient replacement
Autor(en): , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 802-809
DOI: 10.2749/stockholm.2016.0789
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.22 MB

Bridge edge beam replacements in Sweden imply high life-cycle measure costs during the bridge’s life span. Moreover, the long duration of roadworks with a partial or full closure of the bridge caus...
Weiterlesen

Bibliografische Angaben

Autor(en): (KTH Royal Institute of Technology, Stockholm, Sweden)
(KTH Royal Institute of Technology, Stockholm, Sweden)
(KTH Royal Institute of Technology, Stockholm, Sweden)
(Ramböll AB, Stockholm, Sweden)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 802-809 Anzahl der Seiten (im PDF): 8
Seite(n): 802-809
Anzahl der Seiten (im PDF): 8
Jahr: 2016
DOI: 10.2749/stockholm.2016.0789
Abstrakt:

Bridge edge beam replacements in Sweden imply high life-cycle measure costs during the bridge’s life span. Moreover, the long duration of roadworks with a partial or full closure of the bridge causes significant user costs. The Swedish Transport Administration presented new edge beam solutions that could be better for the society in terms of cost. The purpose of this paper is to present the development and implementation processes of a new steel edge beam in a bridge project and evaluate its cost-efficiency. The design and planning phase is described addressing the challenges encountered and explaining the execution of the works. A life-cycle cost analysis is performed to compare with the standard concrete integrated edge beam. The steel edge beam results in a cost-efficient alternative for an edge beam replacement because of the lower life-cycle costs due to a faster execution of works and good working conditions.

Stichwörter:
Edelstahl Wartung