Development and Construction of Non-Metal Bridge

 Development and Construction of Non-Metal Bridge
Autor(en): , , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1385-1393
DOI: 10.2749/stockholm.2016.1380
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

The Non-Metal Bridge was developed to completely eliminate the use of steel members such as steel reinforcements and prestressing steel and it is expected to be able to reduce future maintenance co...
Weiterlesen

Bibliografische Angaben

Autor(en): (West Nippon Expressway, Osaka, Japan)
(West Nippon Expressway, Osaka, Japan)
(West Nippon Expressway, Osaka, Japan)
(Sumitomo Mitsui Construction, Tokyo, Japan)
(Sumitomo Mitsui Construction, Tokyo, Japan)
(Sumitomo Mitsui Construction, Tokyo, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1385-1393 Anzahl der Seiten (im PDF): 9
Seite(n): 1385-1393
Anzahl der Seiten (im PDF): 9
Jahr: 2016
DOI: 10.2749/stockholm.2016.1380
Abstrakt:

The Non-Metal Bridge was developed to completely eliminate the use of steel members such as steel reinforcements and prestressing steel and it is expected to be able to reduce future maintenance costs. Aramid FRP rods were used as prestressing tendons to provide tensile force reinforcement. To eliminate the need for shear reinforcement, high strength fiber reinforced concrete with high shear strength was developed. That structure was conducted by wheel load running tests to verify the fatigue durability. After that, a half scale butterfly girder structure was built by using segmental method and tested to confirm that the structure of the joints between segments was sufficiently durable. Based on those results, the actual experimental bridge was built. This experimental bridge is part of a temporally road and its structural type is simple beam with 14 m of span length. The bridge was constructed by precast segmental method and has been used as a construction road since September of 2015.