Design validation via Infrastructure Health Monitoring of the Circular bridge project

 Design validation via Infrastructure Health Monitoring of the Circular bridge project
Autor(en): ,
Beitrag für IABSE Conference: Risk Intelligence of Infrastructures, Seoul, South Korea, 9-10 November 2020, veröffentlicht in , S. 358-363
DOI: 10.2749/seoul.2020.358
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.14 MB

As part of the Dutch Government's plan to implement schemes to make bridges re-usable, we are presenting a completed Rijkswaterstaat (Road Authority of the Netherlands) pilot project. The ambitious...
Weiterlesen

Bibliografische Angaben

Autor(en): (DYWIDAG Systems International GmbH, Munich, Germany)
(Datum, Bury, UK)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Risk Intelligence of Infrastructures, Seoul, South Korea, 9-10 November 2020
Veröffentlicht in:
Seite(n): 358-363 Anzahl der Seiten (im PDF): 6
Seite(n): 358-363
Anzahl der Seiten (im PDF): 6
DOI: 10.2749/seoul.2020.358
Abstrakt:

As part of the Dutch Government's plan to implement schemes to make bridges re-usable, we are presenting a completed Rijkswaterstaat (Road Authority of the Netherlands) pilot project. The ambitious plan to become "circular" (i.e. re-usable) by 2030 requires to rethink the traditional construction process from the ground up. That means that the conventional way in which bridges are commissioned and build, is no longer applicable. The lifecycle process from design stage to execution and demolition needs to change.

The Circular bridge pilot project demonstrates how bridge engineers designed the structure that utilizing standardized pre-cast concrete segments for a 200-year lifespan. These elements are assembled akin to Lego pieces and post-tensioned (PT) in the longitudinal and transversal directions. When the initial in-place service life of the bridge is reached (say 40 years), these blocks can be de-installed and re-assembled at a different location, hence the term circular.

In order to confirm the design principles and overcome the requirement that the post-tensioning always needs to be bonded within the structure it was necessary to monitor the performance of the bridge during the execution phase. This, in EC terms, is referred to as "design-by-testing". To validate the design, a multi-component Infrastructure Health Monitoring (IHM) system was deployed. The IHM system consisted of camera control of traffic flows (CCTV) measuring vehicle counts, speeds and directions and featured the following sensing instrumentation: temperatures, bridge deflections, bird-gapping between the blocks and force monitoring. As part of the IHM system, alerts and alarms were programmed to be sent to engineers in case measurements exceeded pre-defined thresholds.

Stichwörter:
dynamische Messungen externe Spannglieder Brückenmonitoring