0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design of Multi-span Cable Stayed Bridge at Ambhora, near Nagpur, Maharashtra

 Design of Multi-span Cable Stayed Bridge at Ambhora, near Nagpur, Maharashtra
Autor(en): , ,
Beitrag für IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, veröffentlicht in , S. 143-149
DOI: 10.2749/newdelhi.2023.0143
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 1.19 MB

A multi-span cable stayed bridge is proposed over river Wainganga to re-establish the state highway link from Bhandara to Butibori. The location of the bridge is an important tourist and pilgrimage...
Weiterlesen

Bibliografische Angaben

Autor(en): (SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Chairman and Managing Director, Construma Consultancy Pvt. Ltd.)
(SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Veröffentlicht in:
Seite(n): 143-149 Anzahl der Seiten (im PDF): 7
Seite(n): 143-149
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/newdelhi.2023.0143
Abstrakt:

A multi-span cable stayed bridge is proposed over river Wainganga to re-establish the state highway link from Bhandara to Butibori. The location of the bridge is an important tourist and pilgrimage destination with lush green surroundings and backwaters of Gosekhurd Dam. The bridge has an overall length of 705m and deck width of 15.25m to accommodate 2 lanes of vehicular traffic and 3m+3m footpath for pedestrians. The structural arrangement of the bridge comprises 2 modules, with Module 1 of 420m and Module 2 of 280m length with span arrangements of 70m+140m+140m+70m and 70m+140m+70m respectively. The superstructure is cable stayed with RCC deck with an RCC pylon height of 30m above deck level. The pylon P3 at the center of the bridge is also proposed with Viewing Gallery 40m above deck level which is structurally independent from the main bridge. The Module 1 of the bridge is constructed by cantilever method for pylon P2 and anchored span method for pylon P1 and P3. The Module 2 of the bridge is constructed on staging. This presentation discusses the design and construction aspects of the bridge along with staged construction analysis. This is one of the very few cable stayed bridges in India where all 3 methods of construction of a cable stayed superstructure are adopted in the same bridge.