0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design features of the Cable-stayed Bridge between the islands of Cebu and Mactan (Republic of the Philippines)

 Design features of the Cable-stayed Bridge between the islands of Cebu and Mactan (Republic of the Philippines)
Autor(en): , , , ,
Beitrag für IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, veröffentlicht in , S. 878-886
DOI: 10.2749/istanbul.2023.0878
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.55 MB

The cable stayed between the islands of Cebu and Mactan is the main work of the road concession Cebu-Cordova Link Expressway. Its 390-m long main span over the Cebu port navigation channel turns it...
Weiterlesen

Bibliografische Angaben

Autor(en): (CFCSL, Madrid, Spain)
(CFCSL, Madrid, Spain)
(CFCSL, Madrid, Spain)
(CFCSL, Madrid, Spain)
(CFCSL, Madrid, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Veröffentlicht in:
Seite(n): 878-886 Anzahl der Seiten (im PDF): 9
Seite(n): 878-886
Anzahl der Seiten (im PDF): 9
Jahr: 2023
DOI: 10.2749/istanbul.2023.0878
Abstrakt:

The cable stayed between the islands of Cebu and Mactan is the main work of the road concession Cebu-Cordova Link Expressway. Its 390-m long main span over the Cebu port navigation channel turns it the longest cable-stayed span in the Philippines. This paper provides an overview of its design features emphasizing the distinctive constraints that include high seismicity, geological variability, high wind speeds due to frequent typhoons and large ship impact loads.

Stichwörter:
Kragarm Schrägseilbrücke Erdbebenbemessung

Bauwerke und Projekte