0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design & Construction of WanZhou Yangtze River Railway Bridge

 Design & Construction of WanZhou Yangtze River Railway Bridge
Autor(en): ,
Beitrag für 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, veröffentlicht in , S. 616-617
DOI: 10.2749/222137908796294054
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.34 MB

The main bridge of Wanzhou Yangtze River Railway Bridge is a (168+360+168)m tied arch bridge with continuous steel truss, adopting self-balanced structural system; that is the push force tranfered ...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Veröffentlicht in:
Seite(n): 616-617 Anzahl der Seiten (im PDF): 5
Seite(n): 616-617
Anzahl der Seiten (im PDF): 5
Jahr: 2008
DOI: 10.2749/222137908796294054
Abstrakt:

The main bridge of Wanzhou Yangtze River Railway Bridge is a (168+360+168)m tied arch bridge with continuous steel truss, adopting self-balanced structural system; that is the push force tranfered from arch rib will be balanced by pull force of tied bar, no exterior push force exists. The suspenders adopt “H” shaped steel members, and anti-vibration holes setting of suspenders can prevent wind vibration. The anti-corrosion coating system for steel structure adopts fluorin-carbon dope as the finishing coat. The brdige structural type and anti-corrosion coating system are first adopted in China.The side span was installed by semi-cantilever method supported on temporary pier, while the mid span adopted balanced-cantilever method using sling tower frame, the bridge was closed at midspan.

Stichwörter:
Tragwerksentwurf

Bauwerke und Projekte