Design and construction of the Second Hinterrhein-Bridge

 Design and construction of the Second Hinterrhein-Bridge
Autor(en): , , , ,
Beitrag für IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, veröffentlicht in , S. 984-991
DOI: 10.2749/prague.2022.0984
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.14 MB

The Second Hinterrhein-Bridge is an award-winning new 200m long single-track railway bridge spanning over the river Rhine and the Highway A13 in a picturesque valley in the Swiss Alps. It has four ...
Weiterlesen

Bibliografische Angaben

Autor(en): (WaltGalmarini AG, Zurich, Switzerland)
(WaltGalmarini AG, Zurich, Switzerland)
(WaltGalmarini AG, Zurich, Switzerland)
(COWI UK Limited, London, United Kingdom)
(Dissing+Weitling, Copenhagen, Denmark)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Veröffentlicht in:
Seite(n): 984-991 Anzahl der Seiten (im PDF): 8
Seite(n): 984-991
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/prague.2022.0984
Abstrakt:

The Second Hinterrhein-Bridge is an award-winning new 200m long single-track railway bridge spanning over the river Rhine and the Highway A13 in a picturesque valley in the Swiss Alps. It has four spans and is located adjacent to a magnificent historic steel truss railway bridge. In the continuation of this heritage structure, a matching new 50m long bridge is spanning over the highway. The two bridges were carefully designed into a highly significant and sensitive location both from a transport infrastructure, landscape and heritage point of view. The girders have identical U-shaped cross sections formed by trapezoidal steel boxes on each side, with the tracks supported on ballast on top of a steel plate stiffened by shallow transverse crossbeams. The girders were fabricated in segments in the workshop and assembled on site into lifting segments up to 50m long that were installed by crawler crane. The last segment was lifted onto the new bridge and launched over the highway. On the completed bridge, load tests with two locomotives were carried out before taking the bridge into service. The design was the winner of an international competition held in 2015.

Stichwörter:
Stahl Brücke Vorschub Belastungstest Eisenbahn