0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design and construction of the “Chaumény” footbridge in posttensioned UHPFRC

 Design and construction of the “Chaumény” footbridge in posttensioned UHPFRC
Autor(en): , ORCID, ,
Beitrag für IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, veröffentlicht in , S. 285-292
DOI: 10.2749/prague.2022.0285
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

In 2020/21, the “Chaumény” footbridge was built in posttensioned UHPFRC over a railway line in the city of Montreux, Switzerland. UHPFRC stands for Ultra High Performance Fiber Reinforced Cementiti...
Weiterlesen

Bibliografische Angaben

Autor(en): (Project Manager and CEO of C-Design, Aigle, Switzerland)
ORCID (Professor, Head of Structural Maintenance and Safety Laboratory, EPFL, Switzerland)
(Postdoctoral Researcher, Structural Maintenance and Safety Laboratory, EPFL, Switzerland)
(Engineer of the Township of Montreux, Switzerland)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Veröffentlicht in:
Seite(n): 285-292 Anzahl der Seiten (im PDF): 8
Seite(n): 285-292
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/prague.2022.0285
Abstrakt:

In 2020/21, the “Chaumény” footbridge was built in posttensioned UHPFRC over a railway line in the city of Montreux, Switzerland. UHPFRC stands for Ultra High Performance Fiber Reinforced Cementitious composite. UHPFRC shows high resistance both in tension and compression as well as excellent durability properties. The design and construction of the lightweight structure is described. The structure consists of a U-shaped trough girder with a span of 22.5m above the railway clearance, resting on one abutment and one pier, as well as a staircase leading from the pier down to the ground. The footbridge is composed of several precast elements that were assembled by posttensioning to achieve monolithically linked structure.

Stichwörter:
Fußgängerstege Fußgängerbrücken Fertigteile UHPFRC
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.