0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design and Construction of Beipanjiang Bridge

 Design and Construction of Beipanjiang Bridge
Autor(en): , , ,
Beitrag für IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, veröffentlicht in , S. 505-512
DOI: 10.2749/kualalumpur.2018.0505
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.68 MB

Beipanjiang Bridge is located above the Beipanjiang gorge of depth 565m on the border of Guizhou and Yunan Province, Southwest China. The Bridge main span length 720m is currently the second longes...
Weiterlesen

Bibliografische Angaben

Autor(en): (CCCC Highway Consultants Co., Ltd, Beijing, China (Formerly China Highway Planning &Design Institute Co. Ltd))
(CCCC Highway Consultants Co., Ltd, Beijing, China (Formerly China Highway Planning &Design Institute Co. Ltd))
(CCCC Highway Consultants Co., Ltd, Beijing, China (Formerly China Highway Planning &Design Institute Co. Ltd))
(Guizhou Highway Engineering General Company, Guiyang, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Veröffentlicht in:
Seite(n): 505-512 Anzahl der Seiten (im PDF): 8
Seite(n): 505-512
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/kualalumpur.2018.0505
Abstrakt:

Beipanjiang Bridge is located above the Beipanjiang gorge of depth 565m on the border of Guizhou and Yunan Province, Southwest China. The Bridge main span length 720m is currently the second longest span steel truss girder cable stayed bridge in the world. After the bridge opened to traffic at the end of 2016, the journey time from one side to another is substantially reduced from the original 3 hours to 5 minutes. In the light of the characteristics of the steep terrain variation, karst geology and complicated local wind environment, corresponding studies and investigations were carried out which included the bridge type scheming, main deck structural system, deck erection method as well as freeze alarming technology of stay cable during operation period. This paper describes the salient features, key design and construction technology innovations of this project.

Stichwörter:
Schrägseilbrücke