0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Decision analysis and scenarios for the assessment of existing timber structures

 Decision analysis and scenarios for the assessment of existing timber structures
Autor(en): , , ORCID
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 479-486
DOI: 10.2749/guimaraes.2019.0479
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.81 MB

Condition assessment of existing timber structures is typically followed by a decision about intervention options, and consequently comparing various possible scenarios. These decisions are based o...
Weiterlesen

Bibliografische Angaben

Autor(en): (University of Zagreb, Croatia)
(University of Zagreb, Croatia)
ORCID (RISE Research Institute of Sweden, Gothenburg, Sweden)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 479-486 Anzahl der Seiten (im PDF): 8
Seite(n): 479-486
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/guimaraes.2019.0479
Abstrakt:

Condition assessment of existing timber structures is typically followed by a decision about intervention options, and consequently comparing various possible scenarios. These decisions are based on the updated knowledge obtained through the assessment. Condition assessments, however, can be done in multiple ways, e.g. basic visual assessment of a structure, assessment with various destructive, non-destructive and semi-destructive testing methods, interpretation of a data from structural health monitoring, various levels of structural modelling and safety verification formats. The present paper discusses how pre-posterior decision analysis can guide decisions concerning the condition assessment of timber structures by selecting appropriate assessment procedures and subsequent maintenance actions.

Stichwörter:
Bestandsbewertung ZfP