Crossing the Bjørnafjord with a multi-span suspension bridge on floating foundations – Concept Overview

 Crossing the Bjørnafjord with a multi-span suspension bridge on floating foundations – Concept Overview
Autor(en): , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1883-1889
DOI: 10.2749/stockholm.2016.1896
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

By combining well proven technology from suspension bridge engineering with offshore deep water technology it is found possible to realize a crossing for the 5 km wide and 550 meter deep Bjørnafjor...
Weiterlesen

Bibliografische Angaben

Autor(en): (Norwegian Public Roads Administration, Hamar, NORWAY)
(Norwegian Public Roads Administration, Hamar, NORWAY)
(Norwegian Public Roads Administration, Stavanger, NORWAY)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1883-1889 Anzahl der Seiten (im PDF): 7
Seite(n): 1883-1889
Anzahl der Seiten (im PDF): 7
Jahr: 2016
DOI: 10.2749/stockholm.2016.1896
Abstrakt:

By combining well proven technology from suspension bridge engineering with offshore deep water technology it is found possible to realize a crossing for the 5 km wide and 550 meter deep Bjørnafjord in the western part of Norway. The proposed concept consists of a three span suspension bridge with two rock anchored towers on each side of the fjord, and two floating TLP (Tension Legged Platform) towers midfjord. The two side spans has a length of 1385 meters, the mid span has a length of 1325 meters, and the floaters are anchored at a depth of 550 meters and 450 meters utilizing a combination of suction and gravity anchors or possibly piled anchors. The floaters can be constructed with concrete or steel and two different shapes are looked upon. The superstructure consists of PPWS (Prefabricated Parallel Wire Strands) main cables, hangers and an aero-dynamical box girder. The effect of different configurations of connections and the introduction of a top tie cable to improve global behaviour in the vertical plane are addressed. Major challenges identified are related to ground conditions, environmental loadings, deep sea operations and maintenance and operation.

Stichwörter:
Anker schwimmende Bauten