0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Coura and Valença Bridges on Minho Railway line – old structures, updated performance

 Coura and Valença Bridges on Minho Railway line – old structures, updated performance
Autor(en): ,
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 455-463
DOI: 10.2749/guimaraes.2019.0455
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.77 MB

The pleasant Minho railway single lane line section from Caminha to Valença crosses the Minho river at Valença, through a very interesting and beautiful steel bridge. At Caminha it crosses the rive...
Weiterlesen

Bibliografische Angaben

Autor(en): (Struconcept, Porto, Portugal)
(Struconcept, Porto, Portugal)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 455-463 Anzahl der Seiten (im PDF): 9
Seite(n): 455-463
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/guimaraes.2019.0455
Abstrakt:

The pleasant Minho railway single lane line section from Caminha to Valença crosses the Minho river at Valença, through a very interesting and beautiful steel bridge. At Caminha it crosses the river Coura, by an also attractive steel bridge. Both are more than a century old and were refurbished and upgraded in a recent past and had before severe speed restrictions and load limitations:

  1. Coura bridge: This 1879 iron bridge is a 3 span 164m lower deck continuous closed lattice girder, for a live load of only 4t/m without dynamic effects allowance. It was totally supported by a new continuous steel arch bridge, so both work together, combining in a very elegant construction.

  2. Valença bridge: This double-deck 1886 bridge is a steel 5 span 333m continuous lattice girder. Pathologies like excessive bending on the columns top sections, changing inappropriate bearing and a lock-up system for the braking action resulted in a demanding but discrete reinforcement.

Stichwörter:
Eisenbahnbrücke Stahlbauwerk / -konstruktion