0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Continuously welded rails on temporary bridge decks

 Continuously welded rails on temporary bridge decks
Autor(en): ORCID, ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 397-404
DOI: 10.2749/vancouver.2017.0397
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.22 MB

The possibility of omitting rail expansion devices from the track configuration, when continuously welded rail is continued over temporary bridge decks, is investigated in detail. More specifically...
Weiterlesen

Bibliografische Angaben

Autor(en): ORCID (Ghent University, Ghent, Belgium)
(Ghent University, Ghent, Belgium)
(Ghent University, Ghent, Belgium)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 397-404 Anzahl der Seiten (im PDF): 8
Seite(n): 397-404
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.0397
Abstrakt:

The possibility of omitting rail expansion devices from the track configuration, when continuously welded rail is continued over temporary bridge decks, is investigated in detail. More specifically, the related rail track to temporary bridge interaction phenomena are analysed using finite element modelling. A parametric analysis assesses the additional rail stresses due to moving trainloads and temperature variations, based on stipulations provided in the unit identification code 774-3R. In addition, the model is expanded to a more complex structure that is able to simulate the buckling behaviour of the rail track using non-linear methods. It can be concluded that, depending on the magnitude of two main factors, the lateral ballast resistance and the amplitude of the initial track misalignment, a considerable reduction of the track stability might arise.