0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Condition Assessment and Renewal Options Analysis for the Queensborough Bridge

 Condition Assessment and Renewal Options Analysis for the Queensborough Bridge
Autor(en): , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 2512-2519
DOI: 10.2749/vancouver.2017.2512
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.22 MB

The 41 span, 920m long Queensborough Bridge, constructed in 1960, provides a strategic daily link for 90,000 vehicles over the north arm of the Fraser River connecting New Westminster, BC. The Owne...
Weiterlesen

Bibliografische Angaben

Autor(en): (Mott MacDonald Canada Limited, Vancouver, BC, Canada)
(Mott MacDonald Canada Limited, Vancouver, BC, Canada)
(Hatch, Vancouver, BC, Canada)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 2512-2519 Anzahl der Seiten (im PDF): 8
Seite(n): 2512-2519
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.2512
Abstrakt:

The 41 span, 920m long Queensborough Bridge, constructed in 1960, provides a strategic daily link for 90,000 vehicles over the north arm of the Fraser River connecting New Westminster, BC. The Owner, the BC Ministry of Transportation (Ministry), initiated an in-depth scoping study to assess its current condition, as well as identify and analyze renewal treatment options to enable them to make informed decisions on managing the asset. The importance of limiting user delays was essential when evaluating potential treatment options. Multiple options for rehabilitation of the concrete deck as well as encapsulation and recoating scenarios for the steel girder coating was investigated. Life cycle cost analysis and conceptual traffic staging strategies were prepared. A qualitative assessment matrix, accounting for economics, traffic disruption and risk, was an effective tool in understanding, evaluating, and conveying recommendations.

Stichwörter:
Bestandsbewertung

Bauwerke und Projekte