Certification and operation audit of segmental bridge launching gantries

 Certification and operation audit of segmental bridge launching gantries
Autor(en): , ,
Beitrag für IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, veröffentlicht in , S. 322-323
DOI: 10.2749/222137807796158084
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.63 MB

The Maumee River Crossing Project is a large scale concrete bridge project. The contractor chose segmental construction which required the use of four different types of gantries. To assure a consi...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Veröffentlicht in:
Seite(n): 322-323 Anzahl der Seiten (im PDF): 8
Seite(n): 322-323
Anzahl der Seiten (im PDF): 8
Jahr: 2007
DOI: 10.2749/222137807796158084
Abstrakt:

The Maumee River Crossing Project is a large scale concrete bridge project. The contractor chose segmental construction which required the use of four different types of gantries. To assure a consistent design basis, all of the gantries were checked using the governing project engineering standards and project-specific loads. Due to the unique movement capabilities of these launching structures, each construction step from launch to final segment release was examined for each span, and span-specific work methods were developed. In some cases, gantry modifications were required to handle the project demands. In other cases, constraints posed by the supporting structures necessitated the use of structural supplements and customized operational procedures. A physical inspection of all gantries was performed to verify as-build conditions. In addition, quarterly operation audits were carried out to observe launch procedures and conformance of span-specific work methods.

Stichwörter:
Vorschub