0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A Case Study on the Structural Assessment of an Existing Through Arch Truss Bridge

A Case Study on the Structural Assessment of an Existing Through Arch Truss Bridge
Autor(en): , , ,
Beitrag für IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, veröffentlicht in , S. 493-499
DOI: 10.2749/manchester.2024.0493
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.1 MB

The Seal Island Bridge is a steel through-arch truss bridge in Cape Breton Island, Nova Scotia, Canada with a main span of 152 m over navigable waters. At over 60 years in service, the bridge is ne...
Weiterlesen

Bibliografische Angaben

Autor(en): (COWI North America, Halifax, NS, Canada)
(COWI North America, Halifax, NS, Canada)
(COWI North America, Halifax, NS, Canada)
(Nova Scotia Department of Public Works, Halifax, NS, Canada)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Veröffentlicht in:
Seite(n): 493-499 Anzahl der Seiten (im PDF): 7
Seite(n): 493-499
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/manchester.2024.0493
Abstrakt:

The Seal Island Bridge is a steel through-arch truss bridge in Cape Breton Island, Nova Scotia, Canada with a main span of 152 m over navigable waters. At over 60 years in service, the bridge is near the end of its design life and showing structural and operational difficulties such as a previously failed truss diagonal, the presence of tack welds throughout the structure, cracked floorbeams and wind- induced vibrations. As a part of this study, a series of detailed and focused bridge inspections, including structural health monitoring (SHM), were performed to inform the structural analysis. To assess the structure, a finite element (FE) model was created and calibrated using SHM data and the inspection findings. Additionally, a wind buffeting analysis was performed to refine the wind loading for the assessment. Based on the results of the analysis and investigations, a rehabilitation plan was developed to ensure that the bridge could remain in service for an additional 15 years.

Stichwörter:
Finite-Elemente-Analyse Instandsetzung Bewertung Fachwerkbogen

Bauwerke und Projekte