Cameroon Douala Harbour – Bonabéri – Reconstruction of Quay 52
|
Bibliografische Angaben
Autor(en): |
Pierre Mengeot
|
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Veröffentlicht in: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Seite(n): | 470-471 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2013 | ||||
DOI: | 10.2749/222137813806521108 | ||||
Abstrakt: |
The project consisted of the construction of a new sheet piled wall (220m long, 1150 tons) with the requirement that there was to be no disturbance to the day to day operations of the port. It included the driving of the steel sheet piles in front of the existing wall, the pouring of a reinforced concrete capping beam (850m³), the drilling of 150 anchors (34m) and the installation of new fenders and mooring bollards. |
||||
Stichwörter: |
Anker
|