Build with weathering steel: environmental and economic impacts – Tramway Bridge in Paris suburbs
|
Bibliografische Angaben
Autor(en): |
Loïc Michel
(SYSTRA Bridge Department, Paris, France)
Eric Gogny (SYSTRA Bridge Department, Paris, France) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Veröffentlicht in: | IABSE Conference Geneva 2015 | ||||
|
|||||
Seite(n): | 131-138 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2015 | ||||
DOI: | 10.2749/222137815818357007 | ||||
Abstrakt: |
The new tramway line T7 is located in Paris South suburbs; the line is 11 km in length. Many new bridges were built; the main one is a composite bridge crossing the A86 motorway. The deck is a composite box-girder made of weathering steel and reinforced concrete slab. High constraints for road operation have been imposed by the A86 motorway administrator. A multi-criteria analysis of different bridge solutions, including a life cycle cost analysis, demonstrated the economic and environmental interest of using weathering steel for the deck. |
||||
Stichwörter: |
Umweltbelastung wetterfester Baustahl
|