Bridging Mzamba – Perspectives on Trans-Disciplinary and Cross-Cultural Implementation Process
Autor(en): |
Marlene Wagner
|
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin) |
Veröffentlicht in: | Footbridge 2017 Berlin - Tell A Story |
Jahr: | 2017 |
DOI: | 10.24904/footbridge2017.09564 |
Abstrakt: |
Paper and presentation address the conference theme Cultivate the Debate through the reflection and examination of the collaborative implementation process of a life-saving suspension bridge in South Africa from multiple perspectives. The approach is to tell a story that is focused on actors, the process of production, created social space and bridged cultures rather than the built product. The project bridgingMzamba, located in the global South, serves as an opportunity to enable a collective reflection beyond traditional architectural, engineering or aid practice and representation. The examination of the trans-disciplinary and cross-cultural implementation process from different perspectives and in diverse media aims at a collective knowledge production and to develop strategies of communication for future exertion of necessary infrastructures when the state, the economy and industry fail. |
Stichwörter: |
Impakt Kommunikation
|
Lizenz: | Dieses Werk ist urheberrechtlich geschützt. Der/die Urheber erteilt durch die Veröffentlichung nur das Recht, dieses Werk zu betrachten/lesen und herunterzuladen. Eine weitere Vervielfältigung und Veröffentlichung bedarf der Genehmigung des Urhebers/der Urheber. |
Bauwerke und Projekte
0.97 MB Volltext herunterladen (PDF-Datei)
0.55 MB
- Über diese
Datenseite - Reference-ID
10075312 - Veröffentlicht am:
01.09.2017 - Geändert am:
05.06.2024