Boosting Design Efficiency by using BIM for a Major Railway Project in Nigeria

 Boosting Design Efficiency by using BIM for a Major Railway Project in Nigeria
Autor(en): , , , ,
Beitrag für IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, veröffentlicht in , S. 344-351
DOI: 10.2749/sanjose.2024.0344
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.63 MB

The new railway line from Kano in northern Nigeria to Maradi in Niger, with a secondary line from Kano to Dutse, is a challenging project due to its enormous size spanning some 400 km and requiring...
Weiterlesen

Bibliografische Angaben

Autor(en): (Quadrante Engenharia e Consultoria, S.A., Porto, Portugal)
(Quadrante Engenharia e Consultoria, S.A., Porto, Portugal)
(Quadrante Engenharia e Consultoria, S.A., Porto, Portugal)
(Allplan Software Engineering GmbH, Graz, Austria)
(Allplan Software Engineering GmbH, Graz, Austria)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Veröffentlicht in:
Seite(n): 344-351 Anzahl der Seiten (im PDF): 8
Seite(n): 344-351
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/sanjose.2024.0344
Abstrakt:

The new railway line from Kano in northern Nigeria to Maradi in Niger, with a secondary line from Kano to Dutse, is a challenging project due to its enormous size spanning some 400 km and requiring the construction of 20 railway stations, 5 maintenance yards and workshops, 53 railway bridges, 86 road overpasses, and 7 road underpasses. The Portuguese consulting company Quadrante is responsible for preliminary and detailed design. It comprehensively uses BIM techniques to perform this huge task in a timely manner. Following the motto “Standardization = Efficiency”, an overall infrastructural BIM model for the complete project including stations, bridges, overpasses, and underpasses etc., was developed. The paper shows the adopted BIM techniques which allowed to considerably enhance the design works and to reach the goal of executing the project with maximum efficiency and in accordance with time constraints and accuracy demands.