0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The A82 Pulpit Rock Improvements – A Complex Propped Cantilever Viaduct

The A82 Pulpit Rock Improvements – A Complex Propped Cantilever Viaduct
Autor(en): , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 2375-2382
DOI: 10.2749/stockholm.2016.2366
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.24 MB

The A82 is a primary route in Scotland that follows the shore line of Loch Lomond. Following a landslide in the late 1970’s near the Scheduled Monument, Pulpit Rock, traffic lights were implemented...
Weiterlesen

Bibliografische Angaben

Autor(en): (Tony Gee and Partners LLP. Esher, Surrey, UK)
(Tony Gee and Partners LLP. Esher, Surrey, UK)
(Tony Gee and Partners LLP. Esher, Surrey, UK)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 2375-2382 Anzahl der Seiten (im PDF): 8
Seite(n): 2375-2382
Anzahl der Seiten (im PDF): 8
Jahr: 2016
DOI: 10.2749/stockholm.2016.2366
Abstrakt:

The A82 is a primary route in Scotland that follows the shore line of Loch Lomond. Following a landslide in the late 1970’s near the Scheduled Monument, Pulpit Rock, traffic lights were implemented limiting vehicles to one-way operation. A widening scheme was required to provide a two-way carriageway over a length of approximately 400m. This included a new six span 168m viaduct curved in plan to follow the existing road alignment and running parallel to the loch shoreline. The deck consists of a continuous open trapezoidal steel-concrete composite box girder supported on large diameter intermediate monopile piers socketed into the rock beneath. The construction was phased to minimise road closures. Partial construction of the deck facilitated switching of traffic to the new structure, allowing the remainder of the structure to be completed. This case study paper summarises the design and construction challenges of the viaduct.

Stichwörter:
Viadukt Bauphasen

Bauwerke und Projekte