0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998
Veröffentlicht in:
Seite(n): 57
Jahr: 1998
DOI: 10.5169/seals-59021
Abstrakt:

Meir Tunnel, 284 metres long between portals, forms part ofthe upgrading ofthe A50, through a heavily trafficked urban area of Stoke-on-Trent in England, to dual carriageway. Construction was preceded by the diversion of a large number of utilities, followed by temporary traffic diversions. The walls ofthe twin cell were formed by contiguous bored piles; ground was then excavated to a depth of 2 metres to enable the roof slab to be constructed. Excavation was then carried out beneath the roof, the base was cast, carriageway laid, linings, lighting and controls installed. The tunnel is self-ventilating. Varying levels of lighting are provided; radio rebroadcast facility is provided for emergency services; three crossover openings are provided in the central wall.

Bauwerke und Projekte

Bauwerkstypen

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.5169/seals-59021.
  • Über diese
    Datenseite
  • Reference-ID
    10026935
  • Veröffentlicht am:
    15.02.2007
  • Geändert am:
    20.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine