IABSE Structures - 1987
Erschienen: | 1987 |
---|---|
Thema: | C-43 |
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Chaplin, E. C. | A1 (M) Hatfield Tunnel, full scale research of anchored sheet pile wall (UK) | |
Aeberhard, H. U. | Anchored diaphragm walls for excavation in Zurich (Switzerland) | |
Tamaro, G. | Circular pumping station Massachusetts Bay (USA) | |
Smyth, W. | Deep basement at the British Library, London (UK) | |
Lindh, B. Göran | Deep excavation for gravity separator at steel mill (Sweden) | |
Bingen, A. / De Keyser, R. | Méthode du "terrassement à l'avancement", Métro de Bruxelles (Belgique) | |
Perret, F. M. | Untertageaushub, Neu- und Umbau Bahnhof Luzern (Schweiz) |