Geotechnical and Geological Engineering - v. 42, n. 5 (Januar 2024)
Erschienen: | Januar 2024 |
---|
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Luo, Xiongwen / Xiang, Yanyong / Yu, Chenyun | A Coupled Rock-Pipe Hydraulic Model for Predicting Groundwater Pressure on Tunnel Linings with Embedded Drainage Networks | 3331-3346 |
Zhang, Jiabing / Xiang, Xu / Du, Ronghuan / Zhang, Xiaohu | Enhancing Tunnel Stability Under High Ground Stress: Rheological Analysis and Support Strategies | 3287-3306 |
Aghajari, Meysam / Dehghan, Ali Naghi / Lajevardi, Seyed Hamid | Optimizing Sequential Excavation Method for Ground Settlement Control in Tehran Subway Tunnel Line 6 | 3595-3614 |