Geomechanics and Tunnelling -
Thema: | Early View |
---|
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Zendaki, Yaman / Cao, Ba‐Trung / Stascheit, Janosch / Alsahly, Abdullah / Freitag, Steffen / Maidl, Ulrich / Meschke, Günther | Coupling process controlling data and numerical simulation in mechanised tunnelling | |
Conrads, Alena / Hooi Lim, Oon / Thomas, Ivor | EPB tunnelling at the Silvertown Tunnel Project in London: Approach and challenges of the river crossing in mixed‐face conditions | |
Tilehnoei, Mohammadreza Faraji / Shahriar, Kourosh / Madani, Hassan | Numerical modeling of optimum spacing of TBM disk cutters, using a finite element method simulation |