Geomechanics and Tunnelling - v. 15, n. 3 (Juni 2022)
Erschienen: | Juni 2022 |
---|
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Wenighofer, Robert / Eder, Nina / Speckmoser, Valentin / Villeneuve, Marlène / Winkler, Leopold / Galler, Robert | Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase | 272-278 |
Rabensteiner, Stefan / Weichenberger, Franz Peter / Chmelina, Klaus | Automation and digitalisation of the geological documentation in tunnelling | 298-304 |
Exenberger, Hans / Massimo‐Kaiser, Ines Maria / Flora, Matthias | Current developments of digital ground modelling in tunnelling | 284-289 |
Paskaleva, Galina / Niedermoser, Christoph / Vierhauser, Michael / Mazak‐Huemer, Alexandra / Hruschka, Sabine / Huemer, Christian | Data Drops for Tunnel Information Modelling | 267-271 |
Galler, Robert | Digitisation in Tunnelling – Research | 246 |
Dorninger, Peter / Studnicka, Nikolaus | Efficient digitization of the Zentrum am Berg research tunnel – From laser scan to triangulated surface model within one day | 311-316 |
Konstantis, Spyridon / Prountzopoulos, George / Spyridis, Panagiotis | Ensuring face support and control in soft ground urban tunnels: FEM validation | 317-326 |
Paar, Gerhard / Mett, Michael / Ortner, Thomas / Kup, Daniel / Kontrus, Heiner | High‐resolution real‐time multipurpose tunnel surface 3D rendering | 290-297 |
Winkler, Leopold / Melnyk, Oleksandr / Goger, Gerald | Prerequisites for BIM‐based invoicing in NATM projects | 279-283 |
Hofer, Peter / Eder, Julian / Hager, Lukas / Strauß Bakk, Clemens / Jacobs, Sebastian | RApid Data Integration and Visualization (RADIV) in Subsurface Operations | 305-310 |
Huymajer, Marco / Operta, Dzan / Mazak‐Huemer, Alexandra / Huemer, Christian | The Tunneling Information Management System – A tool for documenting the tunneling process in NATM projects | 259-264 |