Engineering Geology - März 2015
Erschienen: | März 2015 |
---|
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Zhou, Chuang-Bing / Liu, Wu / Chen, Yi-Feng / Hu, Ran / Wei, Kai | Inverse modeling of leakage through a rockfill dam foundation during its construction stage using transient flow model, neural network and genetic algorithm | 183-195 |
Mahinroosta, Reza / Alizadeh, Ali / Gatmiri, Behrouz | Simulation of collapse settlement of first filling in a high rockfill dam | 32-44 |
Wu, J. / Zhang, Z. X. / Kwok, C. Y. | Stability analysis of rock blocks around a cross-harbor tunnel using the improved morphological visualization method | 10-31 |