Architectural Engineering and Design Management - v. 9, n. 4 (November 2013)
Erschienen: | November 2013 |
---|
Artikel in dieser Ausgabe
Autor(en) | Titel | Seite(n) |
---|---|---|
Goulding, Jack S. / Lou, Eric C. W. | E-readiness in construction: an incongruous paradigm of variables | 265-280 |
Markos, P. A. / Dentsoras, A. J. | A heuristic approach for the positioning of elevator hoistways based on the utilization intensity index | 209-228 |
Mlecnik, Erwin | Improving passive house certification: recommendations based on end-user experiences | 250-264 |
Wilkinson, Peter / Glockling, James / Bouchlaghem, Dino / Ruikar, Kirti | Using business impact analyses to enhance resilient fire engineering building design | 229-249 |