Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 11
Seite(n): 395-403
DOI: 10.1108/09699980410571543
Abstrakt:

Host governments often provide guarantees in build‐operate‐transfer (BOT) infrastructure projects to attract private sector investors. Problems arise because the governments often do not know the full extent of contingent liabilities when issuing guarantees, and because they account and record guarantee costs only when guarantees come due. This paper discusses the guarantees' financial impact from the perspectives of the government and the project sponsor. A typical Indonesian BOT toll road project is taken as the case study. Stochastic simulation using Latin Hypercube technique is applied on the cash flow model with and without guarantees. Several types of guarantees including minimum revenue guarantee, maximum interest rate guarantee, debt guarantee, tariff guarantee and minimum traffic guarantee are discussed. Simulation results reveal that guarantees can reduce risk but are not free of cost. If compared with equivalent subsidies, however, some guarantees can be more effective in lessening the extent of project risk.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/09699980410571543.
  • Über diese
    Datenseite
  • Reference-ID
    10576011
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine