0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Ultimas realizaciones en puentes pretensados, de Dragados y Construcciones, S.A

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch, Spanisch
Veröffentlicht in: Hormigón y acero, , n. 170, v. 40
Seite(n): 103-106
Abstrakt:

Last prestressed concrete bridges executed by Dragados y Construcciones, S.A

This article describes four bridges executed recently by Dragados y Construcciones S.A. - Santa Isable Bridge. It is 164 m long with 3 spans of 33/98/33 m. The deck is formed by a cast in place continuous inclined web box girder which thickness increases towards the piers. - Fernando Reig cable-stayed Bridge. With a length of 276 m and one 89,5 m high A shaped tower, the stayed bridge is formed by two precast box girders in 12 m sections. - Kukulara Viaduct. It is integrated by two parallel separated highway structures with a length of 250 m and spans of 40 m. 20 m long cast "in situ" box girder segments compose the deck, executed by the incremental launching method. - Riaño Viaduct. Almost totally constructed by precast elements, it is 838,5 m long, having 21 spans with I shaped girders of 37,40 m long. The piers, formed by two columns have been precast in 21 m high modulus reaching a maximum height of 63 m.

Verfügbar bei: ACHE - Asociación Española de Ingeniería Estructural

Bauwerke und Projekte

Firmen

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10076366
  • Veröffentlicht am:
    23.02.2019
  • Geändert am:
    23.02.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine