Tunnelkette Perschling - Reiserbergtunnel and Stierschweiffeldtunnel

TBM Success under Difficult Ground Conditions

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Geomechanik und Tunnelbau, , n. 6, v. 1
Seite(n): 567-575
DOI: 10.1002/geot.200800061
Abstrakt:

Due to the very difficult geological conditions and the partly low overburden the TBM drives of the "Tunnelkette Perschling" have been a challenge for the persons involved in the project. This paper is a report on the experiences and conclusions gained from two of the three driven tunnels. It deals with the unexpected major occurrences and the related solutions as well as with the adjustment of the concept for backfilling the annular gap in order to achieve sufficient stabilization of the segmental tunnel lining under all conditions encountered.

Verfügbar bei: Siehe Verlag

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/geot.200800061.
  • Über diese
    Datenseite
  • Reference-ID
    10031999
  • Veröffentlicht am:
    20.01.2009
  • Geändert am:
    01.12.2018
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine