0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Trust and the intent to cooperate in energy performance contracting for public buildings in China

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 1, v. 28
Seite(n): 372-396
DOI: 10.1108/ecam-07-2019-0385
Abstrakt:

Purpose

The purpose of this paper is to explore the key factors in generating trust, and the effects of trust on the intention to cooperate in energy performance contracting (EPC), from the perspective of energy saving companies (ESCOs).

Design/methodology/approach

A questionnaire survey was undertaken to collect the data from the experienced project managers in ESCOs. Structural equation modeling was used to test the hypotheses.

Findings

The results revealed that competence, integrity, communication, reciprocity and contract had positive effects on calculative trust and relational trust. Both calculative trust and relational trust, in turn, were found to have positive effects on the intention to cooperate.

Research limitations/implications

The conclusions are derived from the Chinese cultural background and may apply to a certain geographical scope. In addition, this study focused on the perspective of ESCOs but did not consider that of facility owners.

Practical implications

This research would supply guidance for facility owners or users to cultivate trust from ESCOs and achieve cooperation in EPC.

Originality/value

Most of the existing studies have focused on the perspective of facility owners while few have attempted to investigate the perspective of ESCOs. This study contributes to the knowledge body relating to EPC by investigating the relationship between trust and the intention to cooperate from the perspective of ESCOs. In addition, most EPC studies recognized trust as a condition for the successful execution of EPC projects but failed to consider the role of trust in setting up the cooperation relationship prior to project execution.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-07-2019-0385.
  • Über diese
    Datenseite
  • Reference-ID
    10576897
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine