0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Transitions from Guardrail to Bridge Rail That Meet Safety Performance Requirements

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1720
Seite(n): 30-43
DOI: 10.3141/1720-04
Abstrakt:

Three guardrail-to-bridge rail transitions were developed and subjected to full-scale crash tests. The transitions were ( a) a nested W-beam with W-beam rub rail that transitioned from a W-beam guardrail to a vertical concrete parapet bridge rail, ( b) a nested thrie-beam that transitioned from a W-beam guardrail to a tubular steel bridge rail, and ( c) a tubular steel transition that transitioned from a weak-post box-beam guardrail to a tubular steel bridge rail. The nested W-beam and the tubular steel transitions were tested and met NCHRP Report 350 Test Level (TL)-3 requirements. The nested thrie-beam transition was tested and met TL-4 requirements.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3141/1720-04.
  • Über diese
    Datenseite
  • Reference-ID
    10778445
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine