0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Toward BIM and LPS Data Integration for Lean Site Project Management: A State-of-the-Art Review and Recommendations

Autor(en): ORCID




Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Buildings, , n. 5, v. 11
Seite(n): 196
DOI: 10.3390/buildings11050196
Abstrakt:

Over recent years, the independent adoption of lean construction and building information modeling (BIM) has shown improvements in construction industry efficiency. Because these approaches have overlapping concepts, it is thought that their synergistic adoption can bring many more benefits. Today, implementing the lean–BIM theoretical framework is still challenging for many companies. This paper conducts a comprehensive review with the intent to identify prevailing interconnected lean and BIM areas. To this end, 77 papers published in AEC journals and conferences over the last decade were reviewed. The proposed weighting matrix showed the most promising interactions, namely those related to 4D BIM-based visualization of construction schedules produced and updated by last planners. The authors also show evidence of the lack of a sufficiently integrated BIM–Last Planner System® framework and technologies. Thus, we propose a new theoretical framework considering all BIM and LPS interactions. In our model, we suggest automating the generation of phase schedule using joint BIM data and a work breakdown structure database. Thereafter, the lookahead planning and weekly work plan is supported by a field application that must be able to exchange data with the enterprise resource planning system, document management systems, and report progress to the BIM model.

Copyright: © 2021 by the authors; licensee MDPI, Basel, Switzerland.
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10607991
  • Veröffentlicht am:
    15.05.2021
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine