Temporal and Spatial Evolution of Public–Private Partnership (PPP) Project Risks in China: 2003–2019

Autor(en): ORCID
ORCID
ORCID
ORCID
ORCID
ORCID
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Advances in Civil Engineering, , v. 2024
Seite(n): 1-22
DOI: 10.1155/2024/2689594
Abstrakt:

The implementation of public–private partnership (PPP) is perturbed by multiple factors, and it is difficult for the Chinese government to fully control the risks of PPP projects. Based on the DPSIR model, this study constructed the PPP projects risk evaluation index system by using the TOPSIS method. Then the spatial variation, standard deviation ellipse, and gray dynamic model were used to analyze the spatial–temporal dynamic evolution characteristics of the risk level of PPP projects from 2003 to 2019 and to make reasonable predictions of the future spatial distribution pattern. This study yielded the following five results: (1) the average risk level of China’s PPP projects is 0.722, with a decreasing trend of fluctuation and relatively stable risk; (2) high-risk provinces for PPP projects decrease, medium-risk provinces increase; (3) the spatial variability of risk is increasing, and the spatial differentiation is significant, showing a spatial evolution pattern of “west > central > east,” but areas with low-risk values are clearly migrating to the east; (4) the spatial distribution pattern of risk has a north-easterly orientation, with a “north-west to north-east” trend in the path of movement; (5) There are differences in the spatial distribution patterns in the east–west and north–south directions, and the spatial spillover effect is not obvious. Based on the above results, the risk center of China’s PPP projects will be shifted to the northeast in 2025–2035. Our study captures the evolution of PPP project risks in China in both temporal and spatial dimensions, which can provide lessons for optimizing global PPP project risk management.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1155/2024/2689594.
  • Über diese
    Datenseite
  • Reference-ID
    10759403
  • Veröffentlicht am:
    15.03.2024
  • Geändert am:
    15.03.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine