Technology Selection For Construction Project, With The Use Of Fuzzy Preference Relation
Autor(en): |
N. Ibadov
J. Rosłon |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Archives of Civil Engineering, September 2015, n. 3, v. 61 |
Seite(n): | 105-118 |
DOI: | 10.1515/ace-2015-0028 |
Abstrakt: |
Article deals with the problem of technology selection for construction project. Three criteria were proposed: cost, time and technological complexity. To solve the problem, fuzzy preference relations were used. Authors present an algorithm supporting multi-criteria decision-making process. The algorithm creates fuzzy preference relations on the basis of the fuzzy comparison:“xiis better than xj”.Then, with the use of criteria weights it creates general fuzzy preference relation, finds all non-dominated (admissible) alternatives and the best one among them. The algorithm consists of 7 steps. Authors show application of the proposed algorithm - example calculations. |
- Über diese
Datenseite - Reference-ID
10476891 - Veröffentlicht am:
25.11.2020 - Geändert am:
25.11.2020