0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Systematic Drainage Measures in the Tunnel Construction

Experiences in the Neogene Sections of the Investigation Tunnels for the Koralm Tunnel

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Geomechanik und Tunnelbau, , n. 4, v. 1
Seite(n): 287-293
DOI: 10.1002/geot.200800028
Abstrakt:

The Koralm Railway Line represents an essential section of the Pontebbana corridor between Graz and Klagenfurt. It creates new capacities and significantly improved conditions for the freight transportation. Furthermore, the travel time of the passenger traffic will be considerably reduced. The heart of the Koralm Railway Line is the Koralm tunnel with a length of approximately 32.8 km. During excavation of the partly extremely demanding neogene sections of the investigation tunnels for the Koralm Tunnel, valuable experiences can be gained concerning the drainage and the closely related excavation behaviour, in addition to the geological-geotechnical insights. In the paper, the predicted mountain water conditions of the tunnel sections within neogene sediments as well as experiences with the implemented dewatering measures are described. These experiences strongly influence the detailed design of the future main tunnel structure.

Verfügbar bei: Siehe Verlag

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/geot.200800028.
  • Über diese
    Datenseite
  • Reference-ID
    10031961
  • Veröffentlicht am:
    20.01.2009
  • Geändert am:
    30.09.2018
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine