A System for Developing and Evaluating Fire Extinguisher Plans of Construction Projects in Virtual Environments

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Information Technology in Construction, , v. 28
Seite(n): 200-219
DOI: 10.36680/j.itcon.2023.010
Abstrakt:

Fires in under-construction threaten to worker safety and have a lot of negative impacts on many aspects of construction that were reported the past few years. Many constructions do not possess the permanent fire protection system, and only rely on the fire extinguisher or water tank to extinguish the fire. Moreover, a construction site has numerous features that make its uncommon and unanticipated structure. In a construction environment, changing is one of the characteristics that make it unique compared to others. Due to the dynamic nature of construction, the fire safety plan in construction needed to be reviewed and updated according to construction progress. The convention approach or manual process to develop the fire safety plan for a construction project can be a time-consuming and enormous labour-intensive task. BIM technology and Game engine can present the object in 3D and provide programming for the rule-based modelling. Therefore, this paper proposes a framework to assess the fire extinguisher installation plan (FEIP) and recommend the locations of fire extinguisher by considering the dynamic nature of construction. This research develops the prototype that enables the users to define the parameters for the fire extinguisher installation plan such as finished and unfinished building objects (walls, stairs and slabs), exists, the locations of fire extinguishers (FE) and flammable substances (FS). This prototype provides the appropriate locations of fire extinguishers and shows the unsafe area. To validate the proposed approach, the case study using the sample BIM model is executed. The proposed system is expected to have the capability of assisting the safety engineers in developing and assessing the fire extinguisher installation plan.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.36680/j.itcon.2023.010.
  • Über diese
    Datenseite
  • Reference-ID
    10730545
  • Veröffentlicht am:
    30.05.2023
  • Geändert am:
    30.05.2023
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine