Surface Settlement Control in the Excavation of a Shallow Intersection between a Double-Arched Tunnel and a Connection Tunnel
Autor(en): |
Chao Yang
(Associate Professor, Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges Univ., Yichang 443002, China.)
Yanhua Chen (M.Sc. Candidate, Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges Univ., Yichang 443002, China.) Zhe Guo (M.Sc. Candidate, Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges Univ., Yichang 443002, China.) Wenjie Zhu (Undergraduate Student, Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges Univ., Yichang 443002, China.) Ruihong Wang (Professor, Key Laboratory of Geological Hazards on Three Gorges Reservoir Area, Ministry of Education, China Three Gorges Univ., Yichang 443002, China (corresponding author).) |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | International Journal of Geomechanics, April 2021, n. 4, v. 21 |
Seite(n): | 04021035 |
DOI: | 10.1061/(asce)gm.1943-5622.0001983 |
- Über diese
Datenseite - Reference-ID
10606646 - Veröffentlicht am:
08.05.2021 - Geändert am:
08.05.2021