0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Study on Cumulative Damage Law of Surrounding Rock Induced by Blasting during Tunnel Construction

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Physics: Conference Series, , n. 1, v. 2694
Seite(n): 012077
DOI: 10.1088/1742-6596/2694/1/012077
Abstrakt:

The tunnel drilling and blasting method inevitably causes damage to the rock mass during the blasting process. This article takes a certain tunnel as the research object, proposes to simulate the process of continuous blasting and repeated blasting in each section of the tunnel, and quantifies the cumulative damage range of surrounding rock under each working condition. The results indicate that: (1) it is advantageous to use equivalent loads to simulate blasting loads when calculating large-scale blasting damage simulations; (2) The damage to surrounding rock caused by single cycle excavation of tunnels is caused by the superposition of multiple stages of delayed blasting, mainly influenced by adjacent auxiliary equipment.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1742-6596/2694/1/012077.
  • Über diese
    Datenseite
  • Reference-ID
    10777500
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine