State-of-the-Practice for Liquidated Damages, Incentive/Disincentive, and Road User Cost Provisions on High-Value Transportation Projects

Autor(en): (Graduate Research Assistant, Dept. of Civil Engineering, Auburn Univ., 238 Harbert Engineering Center, Auburn, AL 36849-5337 (corresponding author).)
(Brasfield & Gorrie Professor of Construction Engineering and Management, Dept. of Civil Engineering, Auburn Univ., 238 Harbert Engineering Center, Auburn, AL 36849-5337.)
(Lieutenant Commander, Civil Engineer Corps, United States Navy; Facilities Engineering and Acquisition Division Director, Naval Facilities Engineering Command Southeast, Public Works Department Gulfport, 2401 Upper Nixon Ave., Gulfport, MS 39501-5001.)
(Research Fellow IV, Dept. of Civil Engineering, Auburn Univ., 238 Harbert Engineering Center, Auburn, AL 36849-5337.)
(Assistant Professor, Dept. of Civil Engineering, Auburn Univ., 238 Harbert Engineering Center, Auburn, AL 36849-5337.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 11
Seite(n): 04519001
DOI: 10.1061/(asce)la.1943-4170.0000286
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000286.
  • Über diese
    Datenseite
  • Reference-ID
    10579917
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine