Simulation Decision of Bridge Demolition Schemes Based on Multi-Factor Decision-Making Method
Autor(en): |
Zheng Zhong
Yue Zhang Weidong Chen Jing Yang Qiuping Wang Zhicheng Dai |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | IOP Conference Series: Materials Science and Engineering, 1 März 2020, n. 1, v. 790 |
Seite(n): | 012132 |
DOI: | 10.1088/1757-899x/790/1/012132 |
Abstrakt: |
Bridge demolition project involves a variety of factors, belonging to the category of multi-factor decision-making. How to choose a reasonable demolition scheme from a variety of schemes is a problem to be considered. This paper is to use multi-factor decision-making method to optimize and select bridge demolition scheme. Taking the formulation of a certain bridge demolition scheme in China as an example, this paper demonstrates in detail the process of optimization selection and design as well as the result of the bridge demolition scheme. AHP method is used to decompose each factor of bridge demolition to form a hierarchical structure. On this basis, TOPSIS method is used to calculate the proximity between each demolition scheme and the positive ideal solution. Finally, the bridge demolition scheme is selected according to the calculation value. |
- Über diese
Datenseite - Reference-ID
10675253 - Veröffentlicht am:
12.06.2022 - Geändert am:
12.06.2022