0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Shui Su Ravine Bridge Design and its Steel Joint Fatigue Performance Evaluation

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: ce/papers, , n. 3-4, v. 7
Seite(n): 182-187
DOI: 10.1002/cepa.3085
Abstrakt:

Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel‐concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post‐installation of the pre‐cast concrete slab. Since the truss segment is all welded, two‐step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two‐dimensional model, Phase‐Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/cepa.3085.
  • Über diese
    Datenseite
  • Reference-ID
    10799235
  • Veröffentlicht am:
    23.09.2024
  • Geändert am:
    23.09.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine