0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Ship lift at Three Gorges Dam, China - design of steel structures

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Steel Construction, , n. 2, v. 2
Seite(n): 61-71
DOI: 10.1002/stco.200910009
Abstrakt:

The vertical ship lift at the Three Gorges Dam in China will consist of a reinforced concrete structure with an internal steel ship chamber. The chamber will be a self-supporting orthotropic plate structure, continuously suspended from ropes with counterweights. Its components, such as segment gates, drive, horizontal guiding systems in the longitudinal and transverse directions plus locking and safety mechanisms are described here. A special procedure for reducing the tolerances of the steel components embedded in the reinforced concrete structure is explained.

Verfügbar bei: Siehe Verlag

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/stco.200910009.
  • Über diese
    Datenseite
  • Reference-ID
    10058248
  • Veröffentlicht am:
    15.11.2010
  • Geändert am:
    13.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine