0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Sheffield University's new Diamond building benefits from post-tensioning

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Structural Engineer, , n. 3, v. 96
Seite(n): 16-21
DOI: 10.56330/imwy4882
Abstrakt:

While the term 'value engineering' has become synonymous with reducing costs, CCL's approach to re-engineering key elements of the University of Sheffield’s £81M 'Diamond' building with post-tensioned concrete solutions demonstrates the potential added value of re-examining the original specification. Replacement of the specified voided concrete slabs with post-tensioned slabs for levels 1–4 and the roof level not only saved £0.75M in costs on the project, but also saved time within the programme, reduced the amount of materials required for the build and enabled a shallower slab depth. This increased the ceiling void depth below, thereby aiding co-ordination of the building services installation by allowing simplification of cable and pipework layouts. Re-engineering of the proposed steel transfer structures beneath the level 1 slab, with a post-tensioned concrete alternative, helped to overcome buildability, logistical and cost challenges, while creating a design feature aligned to the architect's aesthetic and conceptual vision. A building with ambitious design criteria and multiple technical challenges, the Diamond is a landmark scheme, both for Sheffield and for the higher education sector, which demonstrates the benefits of post-tensioned concrete.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.56330/imwy4882.
  • Über diese
    Datenseite
  • Reference-ID
    10762965
  • Veröffentlicht am:
    23.03.2024
  • Geändert am:
    23.03.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine