Revealing change dynamics in hospital construction projects

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 9, v. 26
Seite(n): 1946-1961
DOI: 10.1108/ecam-03-2018-0119
Abstrakt:

Purpose

Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose of this paper is to explore the root causes of changes in hospital construction projects. The paper aims to propose ways to prepare for the changes.

Design/methodology/approach

The study focuses on changes during the construction of new hospital facilities. An explorative, case study research design is utilised. Five case projects from Finland, Sweden and the USA were selected for in-depth analysis. The primary data comprise semi-structured interviews, supported by secondary evidence such as change order documents.

Findings

The findings reveal eight categories for change sources: contracts, and equipment and systems are reflective of the fast-paced healthcare technology and changing user requirements, while external environment comprises changes caused by both regulatory and physical environment. Changes in operations are reflected in the continuous development of treatment methods and processes. The user, owner, designer and contractor initiated changes represent the stakeholder influence. The paper makes a connection between these change sources and project complexity dimension. A framework for change dynamics is introduced, and product and process flexibility is suggested as a suitable method to prepare for and manage changes.

Originality/value

The paper is the first to link construction changes to project complexity factors. The paper argues that changes, when managed appropriately, are not only necessary but also beneficial to large construction projects in a quickly changing environment. The findings guide project stakeholders in implementing project flexibility, in the product and process dimensions, which is a balancing force to project complexity.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-03-2018-0119.
  • Über diese
    Datenseite
  • Reference-ID
    10576835
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine