0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Renovating the Van Brienenoord Bridge Steelwork in mechanical system of bascule bridge spanning 50m.

Autor(en): (Mechanical / Structural engineer Royal HaskoningDHV The Netherlands)
(Bert Hesselink CEng. Royal HaskoningDHV The Netherlands)
(Jacques Montijn MscEng. MTMC The Netherlands)
(Mechanical / Structural engineer Royal HaskoningDHV The Netherlands)
(Mechanical / Structural engineer The Directorate General for Public Works and Water Management (RWS/GPO) The Netherlands)
(Mechanical / Structural engineer The Directorate General for Public Works and Water Management (RWS/GPO) The Netherlands)
(Mechanical / Structural engineer Royal HaskoningDHV The Netherlands)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: ce/papers, , n. 3-4, v. 6
Seite(n): 1065-1070
DOI: 10.1002/cepa.2645
Abstrakt:

The Van Brienenoord Bridge is a large bridge which includes three movable bascules. The two oldest bascules stem from 1965. A study into renovation and/or replacement of these bascules has been performed and replacement was deemed necessary. A new design for the mechanical driving system has been made, where the design of the western bascule served as starting point. The regulations and requirements have become more stringent since 1965, however the available space is restricted by the existing concrete structure. A steel rack and pinion design is chosen as the best option for the mechanical driving system. In the design of the steel rack, several considerations have been made with respect to the material choice. A fully welded construction was desired due to the lower weight of the construction. However, stringent requirements are made with respect to the hardness, yield strength and tensile strength in several locations of the rack. After considerable calculations and consulting suppliers/manufacturers the tooth rack will be made of 25CrMo4 as the best compromise between material properties and weldability. The pinion material is selected as 34CrNiMo6 since weldability is not an issue. The choice here has to do with the minimum required mechanical properties (even above‐normative refinement). The connection to the concrete structure consists of an eye which is rather big and bulky. This is considered to be rather conservative due to the calculations methods and leaves room for optimisation.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/cepa.2645.
  • Über diese
    Datenseite
  • Reference-ID
    10767079
  • Veröffentlicht am:
    17.04.2024
  • Geändert am:
    17.04.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine